Commissioner’s Regulations
Library Materials Aid – 2011-12 Amendments to Textbook, Software, and Instructional Computer Hardware Aids Statutes
Library Materials Aid – Frequently Asked Questions (NYSED)
Library Materials Calculator – Use this NYLA tool to figure out how much value a patron receives from your library
School Library Program Rubric – This is used to evaluate the library program.
CCD Plan – Components of the CCD Plan
Member Action Plan - Ulster Boces School Library System uses the School Library Program Rubric as a member Action Plan. The rubric can be found at the following link; http://www.nysed.gov/curriculum-instruction/nysed-school-library-program-rubric
School librarians in conjunction with their building administrators are required to complete the rubric as a means of evaluating their program.
1. Statement of Purpose: This program will assist school library media centers in building collections of print or electronic resources that are high in cost, specialized or limited in availability. These specialized collections will be housed in the library media centers of participating schools and will be available for resource sharing.
2. Scope (Participants) School Library Media Centers in Ulster County who belong to the Ulster School Library System
3. Goals
To leverage resources for all participating libraries
To assist participating libraries in sharing resources
To identify specialized areas for resource sharing
4. School Library System Responsibilities
Facilitate the establishment of local needs outside of the core curriculum collection
Establish an advisory group of participating schools
Provide support for material selection
Establish and implement the acquisition, cataloging and maintenance procedures
Maintain the Union Catalog to facilitate ILL
5. Participating School Responsibilities
Follow procedures for the acquisition, cataloging and maintenance of the collection
Make the materials available on the Union Catalog and for ILL
6. Periodic Evaluation The advisory group, along with the SLS Director will:
Review collection needs every year to two years to respond to changing needs
Evaluate the procedure process and make necessary changes
Evaluate the value of the CCD plan to the system and individual schools